subject
Engineering, 22.05.2020 03:07 jessiegarrison1

7.4 A pretimed four-timing-stage signal has critical lane group flow rates for the first three timing stages of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all timing stages). The lost time is known to be 4 seconds for each timing stage. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth timing stage?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
You know the right answer?
7.4 A pretimed four-timing-stage signal has critical lane group flow rates for the first three timin...
Questions
question
History, 26.10.2020 18:00
question
Mathematics, 26.10.2020 18:10
question
Mathematics, 26.10.2020 18:10
Questions on the website: 13722361