Which type of line is necessary at the ends of arrowheads on a dimension line?
A. break...
Engineering, 19.05.2020 02:03 kaitlynmorgan43
Which type of line is necessary at the ends of arrowheads on a dimension line?
A. break line
B. cutting-plane line
C. extension line
D. section line
Answers: 1
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
Engineering, 04.07.2019 19:20
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
Mathematics, 27.03.2021 22:30
Geography, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
English, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
Social Studies, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
Social Studies, 27.03.2021 22:30
Mathematics, 27.03.2021 22:30
French, 27.03.2021 22:30
History, 27.03.2021 22:30