subject
Engineering, 05.05.2020 20:32 saykblahwah309

Baldwin has a new design for their product Bid next round that can reduce their material cost of producing units from $8.14 to $7.32. Baldwin passes on half of all cost savings by cutting the current price to customers. For simplicity: - Use current labor costs of $4.21 - Assume all period costs as reported on Baldwin's Income Statement (Annual Rpt Pg 2) will remain the same. Determine how many units (000) of product Bid would need to be sold next round to break even on the product.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Baldwin has a new design for their product Bid next round that can reduce their material cost of pro...
Questions
question
Mathematics, 16.12.2019 16:31
question
Mathematics, 16.12.2019 16:31
question
Mathematics, 16.12.2019 16:31
Questions on the website: 13722363