The wastewater treatment plant for Alpine City discharges 1.2×104 m3/day of treated waste to the Alpine River. Immediately upstream of the treatment plant, the Alpine River has an ultimate BOD of 3.5 mg/L and a flow of 9×105 m3/day. At a distance of 45 km downstream of the treatment plant, the Alpine River has a 5-day BOD test result of 1.73 mg/L (BOD test rate constant kBOD = 0.2/day). The river has a velocity of 18 km/day. The BOD decay coefficient is 0.1/day. The state’s Department of Environmental Quality (DEQ) has set an ultimate BOD discharge limit for the treatment plant of 1,500 kg/day. a. Is the plant in violation of the DEQ discharge limit?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
question
Engineering, 04.07.2019 19:10
For a process taking place in a closed system containing gas, the volume and pressure relationship is pvi-constant. -1.5 bar, the process starts with initial conditions, pi = =0.03 m3 and ends with final volume, v2-0.05 m3 determine the work done by the gas.
Answers: 2
You know the right answer?
The wastewater treatment plant for Alpine City discharges 1.2×104 m3/day of treated waste to the Alp...
Questions
question
Mathematics, 05.02.2020 06:53
Questions on the website: 13722361