subject
Engineering, 05.05.2020 03:46 bradydodson47

A swine nursery building is being designed to hold 300 pigs weighing 50 pounds each. Water vapor production in the building (from animal respiration and evaporation from wet surfaces) is expected to be 40.2 lbs H2O/hr. Outside air at 30 degrees F dry bulb and 50% RH is to be blown through a fan into the building. The air inside the building is to be at 65 degrees F dry bulb and 70% RH.
Find:
A) Volumetric flow rate (cfm) of air that the fan should move to remove moisture from the building, and B) The rate at which heat (BTU/hr) will be removed from the building in the ventilation air.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
You know the right answer?
A swine nursery building is being designed to hold 300 pigs weighing 50 pounds each. Water vapor pro...
Questions
question
English, 05.05.2020 00:58
question
Physics, 05.05.2020 00:58
question
Mathematics, 05.05.2020 00:58
question
Mathematics, 05.05.2020 00:58
question
Mathematics, 05.05.2020 00:58
Questions on the website: 13722361