subject
Engineering, 06.05.2020 01:59 maudiejane

7.4 A pretimed four-timing-stage signal has critical lane group flow rates for the first three timing stages of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all timing stages). The lost time is known to be 4 seconds for each timing stage. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth timing stage?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
question
Engineering, 04.07.2019 19:20
Heat transfer by is the fastest mode of heat transfer that requires no intervening medium. a)-conduction b)-convection c)-radiation d)-conduction and convection
Answers: 1
You know the right answer?
7.4 A pretimed four-timing-stage signal has critical lane group flow rates for the first three timin...
Questions
question
Mathematics, 13.04.2020 13:51
question
Health, 13.04.2020 13:51
question
Mathematics, 13.04.2020 13:51
question
Mathematics, 13.04.2020 13:51
question
Mathematics, 13.04.2020 13:52
question
English, 13.04.2020 13:52
question
Mathematics, 13.04.2020 13:52
question
Mathematics, 13.04.2020 13:52
Questions on the website: 13722367