GOAL: Shaft Fatigue Analysis

A make-shift temporary derrick is erected over a deep water well in a rural community that has lost access to electric as a result of storm damage. A rope-and-pulley system is attached to the derrick and used to lift a barrel (160 liters) of water from the well. Due to the limited supplies, the system can only provide a 2:1 mechanical advantage. The final pulley is simply supported at the midpoint of a support shaft that is made from a 24" piece of 1018CD 1" diameter round bar. The pulley is connected to the shaft using a shear pin joint made from a 3mm dowel pin inserted into a transverse hole through the shaft. Consider 80% of the life of the shaft as the maximum safe life. The shaft rotates 45 times per each lift.

Make a recommendation on the number of times the system can be used before risking the failure of the shaft.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
question
Engineering, 04.07.2019 19:20
Brief discuss how the presence of dislocations in crystal structures can be an advantage and a disadvantage to engineer and designers.
Answers: 3
You know the right answer?
GOAL: Shaft Fatigue Analysis

A make-shift temporary derrick is erected over a deep wate...
Questions
question
Social Studies, 09.04.2021 09:40
question
Mathematics, 09.04.2021 09:40
question
Mathematics, 09.04.2021 09:40
question
Mathematics, 09.04.2021 09:40
Questions on the website: 13722361