1. A vertical curve joins a -1.2% grade to a +0.8% grade. The two grades intersect at station 75 + 00 and elevation 50.90 m above sea level. The centerline of the roadway must clear a pipe located at station 75 + 40 by 0.80 m. The elevation of the top of the pipe is 51.10 m above sea level. What is the minimum length of the vertical curve that can be used?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
You know the right answer?
1. A vertical curve joins a -1.2% grade to a +0.8% grade. The two grades intersect at station 75 + 0...
Questions
question
Mathematics, 27.01.2021 19:40
question
History, 27.01.2021 19:40
question
Advanced Placement (AP), 27.01.2021 19:40
Questions on the website: 13722361