subject
Engineering, 21.04.2020 21:52 alex43079

Alloy parts were cast with a sand mold that took 160 secs for a cube-shaped casting to solidify. The cube was 50 mm on a side. (a) Determine the value of the Chvorinov's mold constant. (b) If the same alloy and mold type were used, find the total solidification time for a cylindrical casting in which the diameter = 25 mm and length = 50 mm.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
You know the right answer?
Alloy parts were cast with a sand mold that took 160 secs for a cube-shaped casting to solidify. The...
Questions
question
Mathematics, 02.07.2021 05:40
question
Mathematics, 02.07.2021 05:50
Questions on the website: 13722363