Scheduling. Three batch jobs, A through E, arrive at a computer center at almost the same time. They have estimated running times of 10, 6, 2, 4 and 8 minutes. Their priorities are 3, 5, 2, 1 and 4 respectively, with 5 being the highest priority. For each of the following scheduling algorithms, determine the mean turnaround time. Ignore any process switching overhead.

a) Round Robin
b) Priority Scheduling
c) First Come, first served (run in order A, B, C, D, E)
d) Shortest job first

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
Scheduling. Three batch jobs, A through E, arrive at a computer center at almost the same time. They...
Questions
question
Geography, 06.11.2020 01:00
question
Biology, 06.11.2020 01:00
question
Mathematics, 06.11.2020 01:00
question
Engineering, 06.11.2020 01:00
Questions on the website: 13722363