subject
Engineering, 17.04.2020 02:18 RegencySlayer5304

You must supply a 100 MW load. You can buy a five year contract for 100 MW of power 24 hours a day for $130M. (You pay the $130M up front and can consume up to 100 MW per hour. Any power you do not use is lost. But, assume you will use all of it.) Alternatively, you can buy a 100 MW generator with a 30 year life for $70M and pay fuel and maintenance costs of $15/MWh. Analyze costs using a 4% real interest rate and determine which is the cheaper alternative.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
You know the right answer?
You must supply a 100 MW load. You can buy a five year contract for 100 MW of power 24 hours a day f...
Questions
question
English, 06.05.2021 23:10
question
Mathematics, 06.05.2021 23:10
question
English, 06.05.2021 23:10
question
Mathematics, 06.05.2021 23:10
question
Mathematics, 06.05.2021 23:10
Questions on the website: 13722361