subject
Engineering, 14.04.2020 17:38 kitttimothy55

A package is thrown down an incline at A with a velocity of 1 m/s. The package slides along the surface ABC to a conveyor belt which moves with a velocity of 2 m/s. Knowing that d = 6 m and µk = 0.2 between the package and all surfaces, determine (a) the speed of the package at C, (b) the distance the package will slide on the conveyor belt before it comes to rest relative to the belt

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
You know the right answer?
A package is thrown down an incline at A with a velocity of 1 m/s. The package slides along the surf...
Questions
question
Mathematics, 29.10.2021 14:00
question
Mathematics, 29.10.2021 14:00
question
World Languages, 29.10.2021 14:00
Questions on the website: 13722367