(a) If H0: X 127 is tested at .05 using a nondirectional alternative, what is the outcome?
(b) If H0X 118 is tested at .05,what is the outcome?
(c) Explain your answers to (a) and (b).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150Β°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175Β°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25Β°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150Β°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25Β°c, respectively. if the panel is placed in the oven at an initial temperature of 25Β°c and removed from the chamber at a safe-to-touch tempera ture of 37Β°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
You know the right answer?
Given: C(122 X 128) .95.

(a) If H0: X 127 is tested at .05 using a nondirectional alter...
Questions
question
Mathematics, 15.12.2020 18:50
question
Mathematics, 15.12.2020 18:50
question
Biology, 15.12.2020 18:50
question
History, 15.12.2020 18:50
Questions on the website: 13722361