subject
Engineering, 10.04.2020 19:02 sherlock19

Consider the freeway and traffic conditions in Example 6.1. At some point further along the roadway there is a 6% upgrade that is 1.5 mi long. All other characteristics are the same as in Example 6.1. What is the level of service of this portion of the roadway, and how many vehicles can be added before the roadway reaches capacity (assuming that the proportion of vehicle types and the peak-hour factor remain constant).assuming that the vehicle types and peak-hour factor remain the same.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
You know the right answer?
Consider the freeway and traffic conditions in Example 6.1. At some point further along the roadway...
Questions
question
Mathematics, 14.11.2019 03:31
question
Mathematics, 14.11.2019 03:31
Questions on the website: 13722367