subject
Engineering, 09.04.2020 15:13 angellynn581

The clamp is made from members AB and AC, which are pin connected at A. If it exerts a compressive force at C and B of 180 N, sketch the stress distribution acting over section a-a. The screw EF is subjected only to a tensile force along its axis.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:20
Afan that can provide air speeds up to 60 m/s is to be used in a low-speed wind tunnel with atmospheric air at 35 c. if one wishes to use the wind tunnel to study flat-plate boundary layer behavior up to reynolds numbes of re 10, what is the minimum plate length that should be used? at what distance from the leading edge would transition occur if the critical reynolds nurnber were rer,e = 5 × 105?
Answers: 2
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
The clamp is made from members AB and AC, which are pin connected at A. If it exerts a compressive f...
Questions
question
Spanish, 11.03.2021 18:50
question
Mathematics, 11.03.2021 18:50
question
Mathematics, 11.03.2021 18:50
Questions on the website: 13722363