Engineering, 08.04.2020 00:11 Anikarenee

5.12 A toll booth on a turnpike is open from 8:00 A. M. to 12 midnight. Vehicles start arriving at 7:45 A. M. at a uniform deterministic rate of six per minute until 8:15 A. M. and from then on at two per minute. If vehicles are processed at a uniform deterministic rate of six per minute, determine when the queue will dissipate, the total delay, the maximum queue length (in vehicles), the longest vehicle delay under FIFO, and the longest vehicle delay under LIFO.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
You know the right answer?
5.12 A toll booth on a turnpike is open from 8:00 A. M. to 12 midnight. Vehicles start arriving at 7...