The jobsite has a primary vertical control point with a reference (BM) of 100 feet. An instrument is set up with an HI of 9.76' above the BM. A grade stake is set at an elevation of 98.5'. What is the height reading on the rod for setting the receiver at?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
You know the right answer?
The jobsite has a primary vertical control point with a reference (BM) of 100 feet. An instrument is...
Questions
question
Biology, 18.10.2020 07:01
question
Biology, 18.10.2020 07:01
question
Mathematics, 18.10.2020 07:01
question
Mathematics, 18.10.2020 07:01
question
Spanish, 18.10.2020 07:01
question
Biology, 18.10.2020 07:01
question
Mathematics, 18.10.2020 07:01
question
English, 18.10.2020 07:01
Questions on the website: 13722363