Vehicles begin to arrive at a park entrance at 7:45 A. M. at a constant rate of six per minute and at a constant rate of four vehicles per minute from 8:00 A. M. on. The park opens at 8:00 A. M. and the manager wants to set the departure rate so that the average delay per vehicle is no greater than 9 minutes (measured from the time of the first arrival until the total queue clears). Assuming D/D/1 queuing, what is the minimum departure rate needed to achieve this?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:10
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
You know the right answer?
Vehicles begin to arrive at a park entrance at 7:45 A. M. at a constant rate of six per minute and a...
Questions
question
Mathematics, 24.10.2019 08:43
Questions on the website: 13722359