Which type of flowchart scheduling technique has a fixed duration of production activities? In which type of flowchart are they probabilistic
The IPM v type of flow chart has a fixed duration for production activities. The
production activities.
type has a probabilistic duration for

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
question
Engineering, 04.07.2019 19:10
The air in an automobile tire with a volume of 0.015 m3 is at 32°c and 140 kpa gage. determine the amount of air that must be added to raise the pressure to the recommended value of 206 kpa gage. assume the atmospheric pressure to be 128 kpa and the temperature and the volume to remain constant.[r-0.287 kj/kgk]
Answers: 3
You know the right answer?
Which type of flowchart scheduling technique has a fixed duration of production activities? In which...
Questions
Questions on the website: 13722367