subject
Engineering, 06.04.2020 18:11 Gladistshiala267

Vehicles arrive at a single toll booth beginning at 8:00 A. M. They arrive and depart according to a uniform deterministic distribution. However, the toll booth does not open until 8:10 A. M. The average arrival rate is 8 veh/min, and the average departure rate is 10 veh/min. Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of the 100th vehicle to arrive (assuming first-in-first-out)?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
Vehicles arrive at a single toll booth beginning at 8:00 A. M. They arrive and depart according to a...
Questions
question
Mathematics, 06.05.2020 01:35
question
Mathematics, 06.05.2020 01:35
Questions on the website: 13722360