A 150 MVA, 24 kV, 123% three-phase synchronous generator carries the rated load at a power factor 0.83 (lagging). Calculate the necessary excitation voltage and input complex power.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:10
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the major difference between thermoplastics and thermosetting plastics from the polymerization structure point of view?
Answers: 2
You know the right answer?
A 150 MVA, 24 kV, 123% three-phase synchronous generator carries the rated load at a power factor 0....
Questions
question
History, 18.11.2020 05:10
Questions on the website: 13722361