(a) A 10-station assembly machine has an ideal cycle time of 6 sec. The fraction defect rate at each station is 0.005 and a defect always jams the affected station. When a breakdown occurs, it takes 1.2 min, on average, for the system to be put back into operation. Determine (a) the hourly production rate for the assembly machine, (b) yield of good product (final assemblies containing no defective components), and (c) proportion uptime of the system.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
(a) A 10-station assembly machine has an ideal cycle time of 6 sec. The fraction defect rate at each...
Questions
question
Mathematics, 26.08.2020 19:01
Questions on the website: 13722367