subject
Engineering, 25.03.2020 21:20 gokusupersaiyan12345

Develop a preliminary work breakdown structure (WBS) for a small one-story commercial building to be constructed on the site of an existing small-frame structure. It is 30 by 60 ft in plan (see illustration). The exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing. The ceiling is pended acoustical tile. The floor is a concrete slab on grade with an asphalt tile finish. Interior finish on all walls is paint. a) Show the first level of this structure for the total project (WBS is developed from top to the bottom). b) Select one work package (or building system) of the first level and develop the second- level structure for this work package. Heat and mechanical Lavatory Storage

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
You know the right answer?
Develop a preliminary work breakdown structure (WBS) for a small one-story commercial building to be...
Questions
question
Mathematics, 12.06.2021 01:10
question
English, 12.06.2021 01:10
question
Chemistry, 12.06.2021 01:10
question
Arts, 12.06.2021 01:10
question
Mathematics, 12.06.2021 01:10
Questions on the website: 13722363