subject
Engineering, 24.03.2020 06:17 alliemeade1

You need to completelyunderstand the following terms and concepts to do well on Exam I. Each item will have at least on question about it. Some items will have many questions about it. Some items questions may involve more than one item. Neither calculators, nor pen/pencils with paper are allowed. Neither notes nor books are allowed. The exam will be proctored using PAL, 50 questions, time 60 minutes. All questions will be graded by the computer and be similar to the style of the quizzes1. Business analytics2. Reasons for failure of management science3. Decision variables4. Deterministic and probabilistic models5. Strategies to find the "best" solution5. Types of models6. Constraints7. Objective function8. Controllable and uncontrollable inputs

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
You need to completelyunderstand the following terms and concepts to do well on Exam I. Each item wi...
Questions
question
Mathematics, 06.11.2020 17:10
question
Geography, 06.11.2020 17:10
question
Mathematics, 06.11.2020 17:10
Questions on the website: 13722361