subject
Engineering, 23.03.2020 17:25 ndjfn

T or F 1. An accord and satisfaction discharges the original contract upon the formation of the accord.
T or F 2. All rights in a contract can be assigned by either party.
T or F 3. Substantial performance entitles the performing party to full payment of the contract price.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:10
The air in an automobile tire with a volume of 0.015 m3 is at 32°c and 140 kpa gage. determine the amount of air that must be added to raise the pressure to the recommended value of 206 kpa gage. assume the atmospheric pressure to be 128 kpa and the temperature and the volume to remain constant.[r-0.287 kj/kgk]
Answers: 3
question
Engineering, 04.07.2019 19:10
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b.s. and b.s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
You know the right answer?
T or F 1. An accord and satisfaction discharges the original contract upon the formation of the acco...
Questions
question
Mathematics, 28.05.2021 18:40
question
Chemistry, 28.05.2021 18:40
question
Physics, 28.05.2021 18:40
question
English, 28.05.2021 18:40
Questions on the website: 13722367