A highway reconstruction project involves a major realignment of thehighway such that a 60 mph design speed is attained. At one point on the highway, an 800 ft, equal-tangent, crest vertical curve exists. Measurements show that at 3+52 stations from the PVC, the vertical curve offset (tangent offset) is 3 ft.
1. Assess the adequacy of the existing curve in light of the reconstruction design speed of 60 mph.
2. If the existing curve is inadequate, compute a satisfactory curve length.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
question
Engineering, 04.07.2019 19:10
Acircular aluminum shaft mounted in a journal is shown. the symmetric clearance gap between the shaft and journal is filled with sae 10w-30 oil at t 30°c. the shaft is caused to turn by the attached mass and cord. develop and solve a differential equation for the angular speed of the shaft as a function of time.
Answers: 2
You know the right answer?
A highway reconstruction project involves a major realignment of thehighway such that a 60 mph desig...
Questions
question
Mathematics, 27.06.2019 20:30
question
Mathematics, 27.06.2019 20:30
Questions on the website: 13722359