A municipal water system requires an effluent chlorine residual of 0.15 mg/L. The chlorine demand placed upon the system is 0.45 mg/L, and the treatment plant processes a daily water flow of 15,000,000 gal.
The chlorine required is most nearly:

A) 17 kg/d B) 26 kg/d C) 34ka/d D) 43 kg/d

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
You know the right answer?
A municipal water system requires an effluent chlorine residual of 0.15 mg/L. The chlorine demand pl...
Questions
question
Chemistry, 16.01.2021 16:40
Questions on the website: 13722361