subject
Engineering, 11.03.2020 22:23 nisha87

When it is 2 PM Mountain Standard Time (MST) on February 3 in North Platte, NE(L = 101◦ W, φ = 41.1◦ N), what is the solar time? b When it is 2 PM MST in Boise, ID(L = 116◦ W, φ = 43.6◦ N), on February 3, what is the solar time? c What Eastern Daylight Time corresponds to solar noon on July 31 for Portland, ME(L = 70.5◦ W, φ = 43.7◦ N)? d What Central Daylight Time corresponds to 10:00 AM on July 31 for Iron Mountain, MI(L = 90◦ W, φ = 45.8◦ N)?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
When it is 2 PM Mountain Standard Time (MST) on February 3 in North Platte, NE(L = 101◦ W, φ = 41.1◦...
Questions
question
Chemistry, 25.07.2019 10:10
question
Biology, 25.07.2019 10:20
question
Mathematics, 25.07.2019 10:20
question
Social Studies, 25.07.2019 10:20
Questions on the website: 13722363