subject
Engineering, 10.03.2020 07:58 aomoloju4202

is a process for identifying and modeling business events, who initiated them, and how the system should respond to them. a. Use case modeling b. Prototyping c. JAD d. RAD

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
You know the right answer?
is a process for identifying and modeling business events, who initiated them, and how the system sh...
Questions
question
Engineering, 16.12.2021 06:20
question
Mathematics, 16.12.2021 06:20
question
Mathematics, 16.12.2021 06:20
question
Mathematics, 16.12.2021 06:20
question
Physics, 16.12.2021 06:20
question
Mathematics, 16.12.2021 06:20
question
Biology, 16.12.2021 06:20
Questions on the website: 13722363