William, a project manager, needs to prepare the budget for a new software development project. To do so, he takes inputs from other managers who have worked orn similar projects in the past. After estimating the overall project cost, he gives the estimates to his team members so that they car split up the cost of each individual task involved in producing the required deliverable. In this scenario, William is using:.

a. top-down budgeting

b. bittom-up budgeting

c. agile project budgeting

d. dynamic matrix budgeting

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
You know the right answer?
William, a project manager, needs to prepare the budget for a new software development project. To d...
Questions
question
Mathematics, 18.09.2019 07:30
question
Mathematics, 18.09.2019 07:30
Questions on the website: 13722361