subject
Engineering, 02.03.2020 17:50 Itslegit3

Write a generator function named count_seq that doesn't take any parameters and generates a sequence that starts like this: 2, 12, 1112, 3112, 132112, 1113122112, 311311222112, 13211321322112, ...To get a number in the sequence, enumerate how many there are of each digit (in a row) in the previous number. For example, the first number is "one 2", which gives us the second number "12". That number is "one 1" followed by "one 2", which gives us the third number "1112". That number is "three 1" followed by "one 2", or 3112. Etc. Your generator function won't just go up to some limit - it will keep going indefinitely. It may need to treat the first one or two values as special cases, which is fine. Your file must be named: count_seq. py

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
Write a generator function named count_seq that doesn't take any parameters and generates a sequence...
Questions
question
English, 30.10.2020 21:40
question
Mathematics, 30.10.2020 21:40
question
Mathematics, 30.10.2020 21:40
question
English, 30.10.2020 21:40
question
History, 30.10.2020 21:40
Questions on the website: 13722367