In subsea oil and natural gas production, hydrocarbon fluids may leave the reservoir with a temperature of 70°C and flow in subsea surrounding of S°C. As a result of the temperature difference between the reservoir and the subsea surrounding, the knowledge of heat transfer is critical to prevent gas hydrate and wax deposition blockages. Consider a subsea pipeline with inner diameter of O. S m and wall thickness of 8 mm is used for transporting liquid hydrocarbon at an average temperature of 70°C, and the average convection heat transfer coefficient on the inner pipeline surface is estimated to be 2SO W/m2.K. The subsea surrounding has a temperature of soc and the average convection heat transfer coefficient on the outer pipeline surface is estimated to be ISO W /m2 .K. If the pipeline is made of material with thermal conductivity of 60 W/m. K, by using the heat conduction equation (a) obtain the temperature variation in the pipeline wall, (b) determine the inner surface temperature of the pipeline wall, (c) obtain the mathematical expression for the rate of heat loss from the liquid hydrocarbon in the pipeline, and (d) determine the heat flux through the outer pipeline surface.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:10
Agas contained within a piston-cylinder assembly e end nation about same energy states, 1 and 2, where pi 10 bar, v undergoes two processes, a and b, between the sam 0.1 m3, ui-400 kj and p2 1 bar, v2 1.0 m2, u2 200 kj: process a: process from 1 to 2 during which the pressure- volume relation is pv constant process b: constant-volume process from state 1 to a pressure of 2 bar, followed by a linear pressure-volume process to +20 0 state 2 kinetic and potential energy effects can be ignored. for each of the processes a and b, (a) sketch the process on p-v coordinates, (b) evaluate the work, in kj, and (c) evaluate process the heat transfer, in kj
Answers: 2
You know the right answer?
In subsea oil and natural gas production, hydrocarbon fluids may leave the reservoir with a temperat...
Questions
question
Mathematics, 21.05.2021 01:00
question
Chemistry, 21.05.2021 01:00
question
Mathematics, 21.05.2021 01:00
Questions on the website: 13722360