subject
Engineering, 21.02.2020 01:00 kxngtj3

Material use in wind turbine manufacturing. Approximately 65 gigawatts of electrical power are consumed during periods of peak demand in texas. If the entire demand were to be met by wind power and the wind turbines require 25 kg of dysporsium per megawatt of power generated, calculate the total amount of Dy required to manufacture these turbines, and compare this quantity to the total worldwide production of Dy (see U. S. DOE, 2010).

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
You know the right answer?
Material use in wind turbine manufacturing. Approximately 65 gigawatts of electrical power are consu...
Questions
question
Mathematics, 18.01.2020 08:31
Questions on the website: 13722362