If the exploration well is successful, plans are to save the well, temporarily abandon it, and return later to re-enter and complete the well. The plan would also be to install the subsea equipment needed to connect this new well into your subsea system after it had been producing for a couple of years.

List out the following that would be needed to connect a new subsea well into your system?

1) What additional equipment?
2) What design provisions?
3) What key interfaces?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
You know the right answer?
If the exploration well is successful, plans are to save the well, temporarily abandon it, and retur...
Questions
question
Mathematics, 07.11.2020 04:40
question
Mathematics, 07.11.2020 04:40
question
Mathematics, 07.11.2020 04:40
question
Social Studies, 07.11.2020 04:50
Questions on the website: 13722367