subject
Engineering, 11.02.2020 20:04 therealrg10

A machine tool is used to machine parts in batches. In one batch of interest, the starting piece is a casting that costs = $5.00 each. Batch quantity = 40. The actual machining time in the operation = 6.86 min. Time to load and unload each work piece = 2.0 min. cost of the cutting tool = $3.00 and each tool must be changed every 10 pieces. Tool change time = 1.5 min. Setup time for the batch = 1.75 hr. Hourly wage rate of the operator = $16.00/hr, and the applicable labor overhead rate = 50%. Hourly equipment cost rate = $22.00/hr, which includes overhead. Assume availability = 100% and scrap rate = 0. Determine: The cycle time for the piece Average hourly production rate when setup time is figured in; and cost per piece.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
You know the right answer?
A machine tool is used to machine parts in batches. In one batch of interest, the starting piece is...
Questions
question
Arts, 17.11.2020 21:10
question
Mathematics, 17.11.2020 21:10
question
Spanish, 17.11.2020 21:10
question
History, 17.11.2020 21:10
question
Geography, 17.11.2020 21:10
Questions on the website: 13722367