subject
Engineering, 11.02.2020 19:37 weeblordd

Your company has been contracted to purify a new peptide mixture which has been produced by Pharmepere. Your research department has optimized the separation on two existing columns and the production department needs to know which column can operate at the highest volumetric flowrate. Since the stationary phase chemistries are slightly different, each column is operated at a different mobile phase mixture so you will need to take this into consideration for your calculations.

Column 1 Column 2
Mobile Phasae 50/50 Mobile Phasae 70/30
MeOH water by weight MeOH water by weight
dcol= 0.5cm dcol=1.0cm
Lcol= 25cm Lcol= 50cm
εc= 0.4888 εc=0.5330
dp= 10μm dp= 5μm

Due to pumping constraints, the maximum pressure for each system is 150 bar. Please determine which system can operate at the highest volumetric flowrate in mL/min. (Express your answer to 2 significant digits.) Note: εc= Interstitial Porosity

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Your company has been contracted to purify a new peptide mixture which has been produced by Pharmepe...
Questions
question
English, 05.05.2020 00:19
question
Mathematics, 05.05.2020 00:19
question
Mathematics, 05.05.2020 00:19
question
English, 05.05.2020 00:19
question
Mathematics, 05.05.2020 00:19
Questions on the website: 13722363