subject
Engineering, 27.01.2020 18:31 debo77

Green field county stadium is planning to conduct a cricket match between two teams a and b. a large crowd is expected in the stadium as 1 tickets have already been sold. to fulfill the viewers’ requirements, the match administrators are willing to install large display screens inside the stadium which should display the match “live” through several cameras installed on different angles in the stadium.

after carefully reading and analyzing the given scenario, you are required to suggest the “most suitable serial transmission mode” with two strong reasons.

note: format of your answer should be as follow:

mode name:

reason 1:

reason 2:

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
question
Engineering, 04.07.2019 19:20
Apiping systems consists of 6 m of 6-std type k and 12 m of 4-std type k, both drawn copper tubing. the system conveys ethylene glycol at a rate of 0.013 m3/s. the pressure drop across the system is to be calculated. there are two 90° elbows in the 6-in pipe, a reduction from the 6-in pipe to the 4-in pipe and four 90° elbows in the 4-in pipe. all fittings are soldered (same as flanged) and regular. the inlet and outlet of the system are at the same height.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 05.07.2019 19:10
Tech a says never use a water hose to clean up dust after a repair. tech b says never use a floor scrubber to clean up dust after repairs. who is correct?
Answers: 1
You know the right answer?
Green field county stadium is planning to conduct a cricket match between two teams a and b. a large...
Questions
question
Computers and Technology, 27.05.2021 01:00
question
Mathematics, 27.05.2021 01:00
Questions on the website: 13722363