subject
Engineering, 23.01.2020 03:31 ConstanceBhoo301

Acoal-fired power plant equipped with a so2 scrubber is required to achieve an overall so2 removal efficiency of 85%. the existing scrubber is 95% efficient. rather than treating the entire gas stream to 95% removal, the plant proposes to treat part of the flue gas to 95% removal, and to bypass the remainder around the scrubber. calculate the fraction of the flue gas stream that can be bypassed around the scrubber (i. e., qbypass/q) and still satisfy the regulatory requirement.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
You know the right answer?
Acoal-fired power plant equipped with a so2 scrubber is required to achieve an overall so2 removal e...
Questions
question
Mathematics, 11.05.2021 23:00
question
Mathematics, 11.05.2021 23:00
question
Mathematics, 11.05.2021 23:00
question
Mathematics, 11.05.2021 23:00
question
Mathematics, 11.05.2021 23:00
question
English, 11.05.2021 23:00
question
Physics, 11.05.2021 23:00
Questions on the website: 13722367