subject
Engineering, 15.01.2020 21:31 fattypickeltoefungus

This test should be performed on all cord sets, receptacles that aren't part of a building or structure's permanent wiring, and cord-and-plug connected equipment required to be grounded. the point of this test is to make sure that the equipment grounding conductor is electrically continuous

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
You know the right answer?
This test should be performed on all cord sets, receptacles that aren't part of a building or struct...
Questions
question
English, 18.08.2020 01:01
question
Mathematics, 18.08.2020 01:01
question
Mathematics, 18.08.2020 01:01
question
Health, 18.08.2020 01:01
Questions on the website: 13722362