subject
Engineering, 14.01.2020 00:31 scavalieri3746

Which of the following internal control procedures most likely would deter lapping of collections from customers?

a. independent internal verifications of dates of entry in the cash receipts journal with dates of daily cash summaries
b. authorization of write-offs of uncollectible accounts by a supervisor independent of credit approval
c. segregation of duties between receiving cash and posting the accounts receivable ledger
d. supervisory comparison of the daily cash summary with the sum of the cash receipts journal entries

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 19:10
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
question
Engineering, 06.07.2019 03:20
Steam at a pressure of 100 kpa and a quality of 50% initially fills a rigid vessel having a volume of 0.5 m^3. the steam is then heated, causing the pressure in the vessel to rise to 150 kpa. determine: i. the mass of the steam in the vessel. ii. the temperature and quality of the steam after the heating process. ii the mass of the vapour, mg and liquid, m in the vessel after the heating process. if the steam in the vessel is now further heated, what would the pressure and temperature in the vessel be when all steam has turned into saturated vapour? b. sketch the processes in part (a) and part (b) on p-v and t-v diagrams, indicating clearly the temperatures, pressures and the paths. c. (0.59kg, 111.4°c, 73%, 0.4307kg, 0.1 593kg, 2.11 bar, 121.84°c)
Answers: 1
You know the right answer?
Which of the following internal control procedures most likely would deter lapping of collections fr...
Questions
Questions on the website: 13722361