An air-conditioning system operates at a total pressure of 95kpa and consists of a heating section and a humidifier that supplies wet steam (saturated water vapor) at 100°c. air enters the heating section at 10°c and 70% relative humidity at a rate of 35 m^3/min, and it leaves the humidifying section at 20°c and 60 percent relative humidity. determine:

(a) the temperature and relative humidity of air when it leaves the heating section.

(b) the rate of heat transfer in the heating section.

(c) the rate at which water is added to the air in the humidifying section.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
An air-conditioning system operates at a total pressure of 95kpa and consists of a heating section a...
Questions
question
Mathematics, 03.09.2020 22:01
question
History, 03.09.2020 22:01
question
Mathematics, 03.09.2020 22:01
question
Mathematics, 03.09.2020 22:01
Questions on the website: 13722360