Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day. each kanban holds 8 computers. what is the correct number of kanbans?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
question
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor¡n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
You know the right answer?
Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day. each...
Questions
question
English, 12.03.2021 19:00
question
Mathematics, 12.03.2021 19:00
question
Mathematics, 12.03.2021 19:00
question
Mathematics, 12.03.2021 19:00
Questions on the website: 13722367