Alinked earthwork production system (excavation, load/haul/dump, and spread/compaction) is being used on a highway project. the project will require moving 22,000 bcy of moist loam an average haul distance of 1,400 feet. the excavation will take place in average conditions with a hydraulic excavator utilizing a 1.5 cubic yard bucket. the efficiency factor is 50 min-hr. the haul will utilize dump trucks with a capacity of 12 bcy, an average speed of 14 miles per hour, and a dump time of 2.0 minutes. the grade of the haul route is negligible. the spread and compaction will utilize a dozer with a production rate of 400 bcy per hour.

based on this information, calculate the following: a) production rate for excavation (bcy per hour)b) number of trucks required for efficient operationsc) total duration of excavation activity (hours)

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
Alinked earthwork production system (excavation, load/haul/dump, and spread/compaction) is being use...
Questions
question
Spanish, 24.05.2021 16:30
question
Mathematics, 24.05.2021 16:30
Questions on the website: 13722367