Engineering, 16.12.2019 22:31 queenkimm26

An incentive plan employing a kicker is in use. below standard performance the worker is guaranteed a rate of $6 per hour and above standard performance the worker is paid $9.20 per hour.

a job is studied and a rate of 0.036 hours per piece is set.

what is the direct labor cost per piece at the following efficiencies:
a. 50 percent?
b. 80 percent?
c. 98 percent?
d. 105 percent?
e. 150 percent?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
An incentive plan employing a kicker is in use. below standard performance the worker is guaranteed...
Questions
question
Business, 22.06.2021 21:20
question
Mathematics, 22.06.2021 21:20
question
Mathematics, 22.06.2021 21:20
Questions on the website: 13722367