subject
Engineering, 16.12.2019 21:31 Haywood82

Gusing the earned value method, refer to the following diagrams of progress on individual work packages of a project and answer the following questions: a. for case 1, is the project ahead or behind schedule? b. for case 2, is the project over or under budget? c. for case 3, is the cost variance index greater than 1? d. for case 4, is the project on schedule and budget?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30Β°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:10
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60Β°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
question
Engineering, 04.07.2019 18:20
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
You know the right answer?
Gusing the earned value method, refer to the following diagrams of progress on individual work packa...
Questions
question
Mathematics, 14.11.2020 05:30
question
English, 14.11.2020 05:30
question
Business, 14.11.2020 05:30
question
History, 14.11.2020 05:30
question
Mathematics, 14.11.2020 05:30
question
Mathematics, 14.11.2020 05:30
Questions on the website: 13722367