subject
Engineering, 07.12.2019 06:31 laylay120

A60 hz, 120 vrms generator is connected to a load that consumes 30kw of power at a power factor of cos(45) lagging. a capacitor is placed in parallel with the load to improve the power factor to cos(30) lagging. the reactive power without the capacitor is qold = 30kvar and with the capacitor qnew=17.32kvar. what is the value of c?

a. -35 mf
b. -14.7 mf
c. -2.3 mf
d. 0 mf
e. 2.3 mf
f. 14.7 mf
g. 35 mf

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
question
Engineering, 05.07.2019 19:10
Tech a says never use a water hose to clean up dust after a repair. tech b says never use a floor scrubber to clean up dust after repairs. who is correct?
Answers: 1
question
Engineering, 06.07.2019 02:30
Plot schematically the tensile stress versus strain curves for a typical thermoplastic material at a temperature below its glass transition temperature (tg and at a temperature above its tg, respectively. do the same for a typical thermosetting material. list in a table any differences or similarities between the two materials at t> tg and t < tg, respectively, and relate them to the structures of the two types of polymers
Answers: 3
You know the right answer?
A60 hz, 120 vrms generator is connected to a load that consumes 30kw of power at a power factor of c...
Questions