subject
Engineering, 03.12.2019 21:31 babyduckies37

Draw the stack of activation records for the following c program after (a) the call to r on line 13 and (b) after the call to p on line 14. show the control links, and fill in the local names in each activation record. (c) describe how variables r and x are found on lines 4 and 5 during the execution of p.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
You know the right answer?
Draw the stack of activation records for the following c program after (a) the call to r on line 13...
Questions
question
History, 12.05.2021 18:50
question
Mathematics, 12.05.2021 18:50
question
Mathematics, 12.05.2021 18:50
question
Mathematics, 12.05.2021 18:50
Questions on the website: 13722361