Develop a material requirements plan for component h. lead times for the end item and each component except b are one week. the lead time for b is three weeks. sixty units of a are needed at the start of week 8. there are currently 15 units of b on hand and 130 of e on hand, and 50 units of h are in production and will be completed by the start of week 2. (leave no cells blank - be certain to enter "0" wherever required.)

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
question
Engineering, 04.07.2019 19:20
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
question
Engineering, 06.07.2019 03:10
List and describe the parts of boxford cnc milling machine with pictures?
Answers: 2
You know the right answer?
Develop a material requirements plan for component h. lead times for the end item and each component...
Questions
Questions on the website: 13722367