subject
Engineering, 28.11.2019 20:31 Nowellkwaku

In cell g8 in the summary worksheet, insert a date function to calculate the number of years between 1/1/2018 in cell h2 and the last remodel date in the last remodel column (cell f8). use relative and mixed references correctly. copy the function to the range g9: g57. unit 101 was last remodeled 13.75 years ago. ensure that the function you use displays that result.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:20
A5 kg block of fe is dropped into a very large vat of water. the fe and water initial temperatures are 95 and 25 c, respectively. the fe final temperature is 25 c and the water can be treated as a thermal reservoir,. treated as a thermal reservoir take the water to be the system and determine the entropy generation. report vour answer in kj/k.
Answers: 1
question
Engineering, 05.07.2019 23:20
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
You know the right answer?
In cell g8 in the summary worksheet, insert a date function to calculate the number of years between...
Questions
question
English, 16.10.2020 08:01
question
Mathematics, 16.10.2020 08:01
question
Mathematics, 16.10.2020 08:01
Questions on the website: 13722359