subject
Engineering, 27.11.2019 21:31 lisamccray45

Aflux-cored arc-welding process is used to join two low-alloy steel plates at a 90° angle. the joint is an outside fillet weld. the plates are 1⁄4-in thick. the weld bead consists of 55% metal from the electrode and 45% from the steel plates. the heat transfer factor for fcaw = 0.9, and the melting factor = 0.65. welding current = 120 amps, and voltage = 20 volts. velocity of the welding head = 25 in/min. electrode wire diameter = 0.125 in. a core of flux (compounds that do not become part of the weld bead) runs through the center of the electrode. the diameter of the core = 0.0625 in. (a) what is the cross-sectional area of the weld bead? (b) how fast must the electrode wire be fed into the welding operation?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:20
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
question
Engineering, 06.07.2019 03:10
An electrical kettle is made out of stainless steel,weighs two pounds (when empty) with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling.
Answers: 1
question
Engineering, 06.07.2019 05:10
The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is 392 mw, and the net output is 377 mw. the planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. at best the plant thermal efficiency appears to be 18%. in addition, for the daily startup process, the solar plant also burned 1.3x10^12 btu of natural gas in 2016. the cost of natural gas in 2016 was about $2.5 per million btu. assuming a levelized annual fixed charge rate of 7%, determine (a) the capital cost (c/kwh) and (b) the fuel cost (e/k wh) for the electricity in 2016.
Answers: 3
You know the right answer?
Aflux-cored arc-welding process is used to join two low-alloy steel plates at a 90° angle. the joint...
Questions
question
Mathematics, 14.04.2020 04:11
question
Mathematics, 14.04.2020 04:11
question
Social Studies, 14.04.2020 04:11
Questions on the website: 13722363